(416) 562-2555 adamsimongta@gmail.com Serving Toronto & the GTA — Free, no-obligation estimates

Maple Homes Ready for Their First Big Refresh

New floors, rebuilt stairs, updated bathrooms and fresh paint for Maple houses from the 1990s and 2000s that still have their original finishes.

Much of Maple went up in one burst. Homebuilding reached the former Maple Airport lands in 1993, which is why several streets there carry aircraft names, and subdivisions had spread toward Highway 400 and Teston Road by about 2000. Houses from that stretch are now old enough that carpet, stair coverings and first-generation bathrooms tend to wear out at roughly the same time.

The wear pattern of a 1990s subdivision house

Beyond the original village crossroads at Keele Street and Major Mackenzie Drive, many streets were filled by production builders within a few seasons of each other. Neighbouring houses often share more than a floor plan; they share a wear pattern too. In a typical Maple home from that era we find:

  • Wall-to-wall carpet in bedrooms and on the stairs, flattened along the traffic paths, sometimes over a subfloor that squeaks
  • Carpeted stairs with an oak handrail and pickets that no longer suit the rest of the house
  • Main-floor ceramic tile cracked where the floor flexes, or sheet vinyl lifting at the seams
  • Ensuites built around a corner soaker tub, a separate acrylic shower stall and a basic vanity, with grout and caulking that have worn thin
  • Builder-flat paint, nail pops in the drywall and scuffed walls along the stairwell

None of it is urgent on its own. Tackled together, though, the work can be sequenced so each trade finishes cleanly against the next, instead of new flooring being cut up for a bathroom a year later.

Planning the refresh one surface at a time

Floors and stairs

Taking out carpet is usually the most visible change. Before anything new goes down, we screw down loose subflooring to quiet the squeaks, then check the height at every transition, especially where a new hardwood or vinyl plank floor meets existing kitchen tile. Stairs can often keep their structure: carpeted treads are replaced with hardwood treads and risers, and the old oak pickets can be swapped for metal spindles or painted balusters. Matching the stair nosing to the new floor is what makes the two look like they were built together.

Bathrooms

Many Maple ensuites from the late 1990s were given plenty of floor area, which opens up options. A common choice is to remove the corner tub and build a larger walk-in shower with a glass panel, or keep a freestanding tub and gain space for a double vanity. Tile goes over a proper membrane, and any change to drain or supply locations is handled by the qualified trades that part requires. An ensuite on this scale is typically a two-to-four-week job.

Paint as the last step

Painting comes after the dusty work, never before. Drywall repairs, nail pops and old anchor holes are filled and sanded, and patches are primed so they do not flash through. Two-storey foyers and open stairwells, common in houses built here in the 1990s, need proper staging to reach the upper walls safely, and we plan for that from the first visit.

Houses around the old village crossroads may sit inside the Maple Heritage Conservation District. There, the city's heritage review concerns exterior changes such as windows, porches or siding, rather than the floors, stairs and bathrooms described on this page.

Owners can usually stay in their Maple house while all this happens. We work one zone at a time, keep at least one bathroom and the kitchen usable, and cover finished floors as the trades move through, so a phased refresh does not mean months of living in a construction site.

Local Know-How in Maple

Carpet out, hard floors in

Subfloors screwed down to stop squeaks, transitions planned against existing tile, and hardwood, engineered or vinyl plank flooring installed room by room with furniture moved as we go.

Stairs that match the floor

Carpeted stairs converted to hardwood treads and risers, with new pickets or balusters and stair nosings matched to the flooring on each landing.

Ensuites past their first life

Corner soaker tubs and dated shower stalls replaced with walk-in showers, new tile and vanities, using the generous floor area many late-1990s ensuites were given.

Areas We Cover in and Around Maple

  • Maple village core
  • Eagle Hills
  • Thornberry Woods
  • Peace Village
  • Teston
  • Sherwood
Services in Maple

Renovation Services for Maple Properties

The work Maple clients ask us for most often, plus every other service our team can take on for you.

Flooring Installation

Flooring Installation

Expert installation of hardwood, engineered wood, laminate and vinyl plank flooring with careful subfloor preparation and clean transitions.

Bathroom Renovations

Bathroom Renovations

Modern, durable bathrooms with proper waterproofing, precise tile work and quality fixtures — from powder rooms to full ensuites.

Interior & Exterior Painting

Interior & Exterior Painting

Clean, professional painting for walls, ceilings, trim and doors — with careful preparation, protected surfaces and a flawless finish.

Tile Installation

Tile Installation

Precise tile installation for floors, showers, backsplashes and feature walls — with proper preparation, waterproofing and crisp, even…

Drywall & Taping

Drywall & Taping

Professional drywall installation, taping, mudding and finishing for smooth, paint-ready walls and ceilings — plus clean, invisible repairs.

Repairs & Maintenance

Repairs & Maintenance

Reliable repairs of every size — from drywall patches and door adjustments to trim, flooring and fixture repairs — for homes, rentals and…

Also Available in Maple

Recent Projects Near Maple

View All Projects
Local Questions

Renovating in Maple: Your Questions Answered

In most houses of this age, yes. The carpet and pad come off, the existing stringers stay, and new hardwood treads and risers are fitted over the structure, or the old treads are replaced one by one. Pickets and the handrail can be kept, refinished or replaced. We look at the stair first to confirm the structure is solid and to measure how the new nosings will meet each landing.

For many households the corner tub gets little use and takes up the most useful corner of the room. Replacing it with a larger walk-in shower, or with a smaller freestanding tub plus a shower, usually makes the space work harder. Moving a drain needs the proper trade and sometimes opening the ceiling below, so we plan that before choosing tile. From demolition to the last bead of caulk, the room is usually back in use in two to four weeks.

Usually the cause is underneath. Ceramic tile needs a stiff base, and cracks that run in a line tend to point to a floor that flexes or a subfloor too thin for tile. We lift a section to see how it was built, then stiffen the subfloor and add a crack-isolation membrane before new tile goes down. If the joists themselves look undersized or damaged, that needs a proper structural assessment before any finish work goes in.

Serving All of Maple

Ready When You Are

Let’s Bring Your Renovation Plans to Life

Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.

Call Now Free Estimate