(416) 562-2555 info@sulyrenovation.ca Serving Toronto & the GTA — Free, no-obligation estimates

Port Perry Renovations for Queen Street Brick, Bungalows and Lake Lots

Renovations for Queen Street's brick blocks, the 1960s and 70s bungalows and split-levels around them, and homes on Lake Scugog's shore and out on the island, many of them on their own wells.

Lake Scugog sets the eastern edge of Port Perry, and the main street still faces it with the brick blocks merchants raised after the fires of the 1880s. Peter Perry laid out the first village lots on that shore in 1848. Around the core come Victorian houses, then streets of bungalows and split-levels, then newer subdivisions, and the rest of Scugog is farmland, hamlets and shoreline. A job on Queen Street and one on Scugog Island, a few minutes apart, can begin with entirely different approvals.

Lake Scugog and who regulates its shoreline

Lake Scugog is largely man-made. In 1834 a mill dam on the Scugog River at Lindsay raised the water by about three metres, which cut Scugog Island off from the mainland and left a lake that averages only about 1.4 metres deep. The island is joined to town by the causeway that carries Highway 7A. Kawartha Conservation regulates land along the shore, and inside its mapped area, building or demolishing a structure, placing fill, regrading or adding a new stone wall at the water's edge can each require an authority permit on top of the Township's. The Township's checklist also names the Lake Simcoe and Central Lake Ontario authorities, because parts of the township fall within their watersheds. We confirm which one covers a lot before drawings are ordered, and plan any addition or new deck by the water around the answer.

Queen Street, rebuilt in brick after 1884

Port Perry was incorporated as a village in 1871, and a year later the Port Whitby and Port Perry Railway brought its first train in, linking the village to the harbour at Port Whitby. Then fire took the business district twice. In November 1883 a blaze razed the north side of Queen Street. The following April, council banned new wooden buildings along Queen between Water and John streets, and in July 1884 a second fire turned most of what remained to ash in under ninety minutes. Merchants rebuilt in brick within months, and those blocks still set the character of the street.

Today those blocks form the core of the Downtown Port Perry Heritage Conservation District, created under By-law 91-10. Changes to the outside of a building there go through a Township heritage permit. On these properties, whether the job is a new rear stair or a gutted shop interior, we read what the district plan says about it before a price is settled.

Three rings of houses around the old core

Residential Port Perry spreads out from downtown in roughly three rings. Closest in are houses from the second half of the 1800s, frame and brick, many of them added onto by later owners. Next come the ranch bungalows and split-levels built as the town grew after 1960; census-based profiles put about a quarter of local homes in the 1961 to 1980 bracket and close to one in five before that. On the outer edges, subdivisions built from the 1980s onward added detached houses and townhomes. Roughly four homes in five are single detached.

Each ring opens a different first conversation. In the oldest houses it is what hides behind the plaster and how often the plan has been changed. In the bungalows it is usually a full-height lower level still waiting for a proper finish, which is where our basement finishing work tends to begin. In the newest streets it is mostly finishes, storage and the rooms nobody got around to completing.

Town water, hamlet water and private wells

Port Perry and neighbouring Prince Albert draw their water from Regional municipal wells, delivered through about 70 kilometres of watermain. Blackstock and Greenbank have small Regional water systems of their own, but on Scugog Island, along the lake roads and across the farmland between the hamlets, a house generally relies on its own well and a septic bed. That difference shapes a renovation from day one. The Township's permit checklist asks for a site plan marking where the well and septic sit, and it requires approval from the Region of Durham Health Department for any added construction on a lot served by septic. The department's septic staff work from the second floor of 181 Perry Street, the same building as the Township office. We collect these details at the estimate visit, so approvals and drawings move forward together.

Local Know-How in Port Perry

Brick blocks downtown

Queen Street buildings get a plan that respects the heritage district on the outside while the space behind the facade is rebuilt for a new owner or tenant.

Town services or your own

Early on we pin down whether a house runs on Regional water and sewer or on a private well and septic, because that decides which approvals come first.

Lake Scugog shoreline lots

For homes on Scugog Island or along the lake roads, conservation mapping is reviewed before anyone sketches an addition, a garage or a new deck.

Areas We Cover in and Around Port Perry

  • Downtown Port Perry
  • Prince Albert
  • Scugog Island
  • Caesarea
  • Manchester
  • Utica
  • Greenbank
  • Seagrave
  • Blackstock
  • Epsom
Services in Port Perry

Renovation Services for Port Perry Properties

Port Perry House Renovations for Victorian Frame and Brick Homes

Mary, John, Casimir, Bigelow and Cochrane streets are lined with houses from the 1860s to the early 1900s, many of them on the Township's heritage register. Inside, they tend to share the same bones: tall ceilings, deep baseboards and casings, and plaster walls that have settled into gentle curves. A whole-house update usually works with that scale rather than against it, so where plaster has failed we hang drywall shimmed to the old wall planes, have casings and baseboards milled to match missing runs, and level floors only where a sag points to a problem underneath. A licensed electrician and plumber bring the services up to date before new board goes up, and an engineer reviews any opening cut into a bearing wall.

Read more about general renovations

Basement Renovations and Additional Units in Port Perry Bungalows

A bungalow from the 1960s or 70s often sits over a full-height basement with one open room, a furnace near the middle and small windows, which makes it a natural place for a second unit. Scugog's Additional Dwelling Unit By-law No. 12-25, passed in March 2025, allows up to two extra units inside a house in Port Perry and the hamlets, or one inside and one in a detached accessory building, though none on land the conservation authority treats as hazardous. A basement apartment still needs a building permit and drawings showing fire separation and a proper exit, which a designer prepares. Working from that set, our crew handles the framing, insulation, drywall and finishes, a build-out of four to eight weeks.

Read more about basement finishing

Kitchen Remodeling in Port Perry Split-Levels and Ranch Bungalows

In a ranch bungalow the kitchen often runs along one wall beside a separate dining room, and in a split-level it sits on the middle level with the bedroom stairs right behind it. Opening either one usually means removing or shortening a wall that can carry ceiling joists, so an engineer specifies a beam before it comes out. Country homes on a well often have a softener or filter near the kitchen or utility room, and Scugog lists installing a water softener among the jobs needing a permit, so the plumber plans any relocation alongside the new sink lines. We install the cabinets, counters, backsplash tile, flooring and paint, and a licensed electrician adds the circuits.

Read more about kitchen renovations

Bathroom Renovations in Port Perry's Victorian Houses and Bungalows

In the ranch bungalows and split-levels around the core, the original four-piece often survives, its wall tile set in a thick bed of mortar over wire lath. That kind of tile comes off in heavy slabs and tends to leave studs out of line, so we strip to the framing, straighten it with sister studs and rebuild with cement board and a waterproof membrane before new tile goes up. A tub that has sat on the same subfloor for fifty years is lifted and the floor checked for soft spots around the drain. Supply, drain and vent work goes to a licensed plumber under the Township permit; we handle the subfloor, framing for a niche or bench, tile, vanity and paint.

Read more about bathroom renovations

Port Perry Deck Builder for Lake Scugog Views

Scugog's permit list includes building a deck and gives no size cut-off for it, so we plan on a permit until the Building Department says otherwise. On a lakeside property inside Kawartha Conservation's regulated area, a deck also counts as development, though unenclosed decks are among the lower-risk projects the authority handles through a streamlined permit. Before the layout is fixed, we confirm where footings can go, keeping clear of the septic bed on rural lots and of any setback the authority sets from the water. Where the deck faces the water, owners often pick glass panels or slim aluminum pickets so the railing does not block Lake Scugog, over composite boards that only need washing. A licensed electrician runs the wiring for any deck lights.

Read more about decks & outdoor living

Commercial Renovations Behind Port Perry's Queen Street Storefronts

Shops, cafes and offices downtown occupy brick blocks well over a century old, so a new tenant's fit-out often begins with uneven floors, shared masonry walls and ceilings that earlier tenants dropped. The Township lists interior alterations to non-residential units among the projects requiring a building permit, and new signs on a facade need one as well; inside the district, signage also follows its own heritage sign permit process. Owners restoring a front can ask about the Township's Heritage Conservation District grant program. We build partitions, drywall, ceilings, flooring and paint, sequenced around opening hours, while licensed trades move lighting, plumbing and any sprinkler heads.

Read more about commercial renovations

Insulation for Port Perry Sunrooms and Enclosed Porches

Around Caesarea and along other stretches of the Lake Scugog shoreline, a number of homes started out as cottages, and their three-season rooms and screened porches are often the last parts still closed off in winter. The Township treats making them usable all year as a permit job: converting a seasonal room for year-round use and enclosing a porch are both on its list. The room generally has to meet the same energy rules as the rest of the house, which usually means opening the floor, walls and ceiling, fitting batts or rigid board and sealing the vapour barrier on the warm side, while a window supplier replaces thin single glazing. A heating contractor or electrician adds the heat; we frame, insulate, drywall and trim the room.

Read more about insulation

Also Available in Port Perry

Local Questions

Renovating in Port Perry: Your Questions Answered

The Township's heritage permit is aimed at exterior changes to buildings in the Downtown Port Perry Heritage Conservation District, so interior work on its own does not usually call for one. Anything visible from outside, such as new windows, doors or a storefront, generally goes through heritage review. Applications are filed through Cloudpermit, and the Township encourages a pre-consultation with its Building Department to confirm whether a heritage permit, a building permit or both apply.

Often yes, but expect two approvals. Adding a bedroom is on the Township's building permit list, and because a septic system is sized for the home's daily design flow, which depends largely on the number of bedrooms, the Region of Durham Health Department checks whether the existing system can take the extra load. If it cannot, a septic designer and installer handle the upgrade. We build the room once both have signed off.

The authority points owners to Conservation Ontario's online CA Maps tool, which shows whether a property falls inside its regulated area, including floodplains. If yours does, Kawartha Conservation offers free pre-consultation meetings at its office in Lindsay, or you can call its permit staff with a short description of the project before paying for full drawings. Their answer can affect where an addition or garage may sit and how much regrading the yard can take.

It can. The Township asks for an Oak Ridges Moraine conformity assessment form for any new building or structure proposed there, and it notes that expanding an existing house by more than 93 square metres may lead to a site plan agreement. Second units are limited as well: in the moraine's Countryside Area, one additional unit is allowed, and only inside the main house. Interior work within the existing footprint is usually simpler, but confirm your designation with the Township's planning staff.

Serving All of Port Perry

Ready When You Are

Let’s Bring Your Renovation Plans to Life

Tell us about your project and receive a free, detailed estimate — no pressure and no obligation. From quick repairs to complete renovations, our team is ready to help.

Call Now Free Estimate